Construction Management
SAMOOCM, a professional construction management company with 48 years of history,
is truly the best construction management company in the country.
the development of the nation’s CM industry
Bundang KT Headquarters
(Formerly, Bundang Information Communication Center)
Suwon World Cup Stadium
(announced on 2021.08.31 by the Ministry of Land, Infrastructure and Transportation)
(KRW100M)
(KRW100M)
(KRW100M)
(KRW100M)
SAMOOCM provides real time support to around 100 sites using a headquarters-field connection system
connecting the headquarters’ support team consisting of top-level experts in each field with project operation teams.
-
Safety & Environment Management Team
Safety, quality, environment, complaint resolution
-
BIM Team
Review of involvement in process and construction ability
-
Design Management Team
Design management and review
-
Process Management Team
Process management support
-
VE Team
Review of economic feasibility
-
Cost Management Team
Project cost management support
-
DFS(Design For Safety) Team
Review of design stability
-
Sustainable Architecture Team
Certification/energy reduction technology support
operation team
support
nationwide
project characteristics Bidding method proposal, design
improvement, BIM utilization, etc.
-
3.11% ReductionSamyang Foods Miryang Plant
-
2.75% ReductionLotte Time Villas
-
3.81% ReductionHaenam Country Hall
-
6.21% Reductionjtbc studio Ilsan
-
3.95% ReductionGyeongsang National University Changwon Hospital
-
6.47% ReductionIncheon International Airport
-
6.19% ReductionKIST Jeonbuk (Institute of Advanced Composite Materials)
-
5.16% ReductionThe Federation of Korean Industries Building
project costs in the entire construction process based on
the country’s largest database
-
01
Rough cost estimate (similar projects in database)
Planning -
02
Review of design appropriateness/ Design cost calculation
Design -
03
Assistance in budget finalization/ execution plan establishment
-
04
Construction order planning
-
05
Bid price
verificationConstruction Request -
06
Contractor selection/contract detail adjustment
-
07
Completed works and design change management
Construction -
08
Budget execution result analysis
Completion
a professional process management team and process
- Licensing support team
- Process management team
- Design management team
- Initiation phase
- Design phase
- Construction phase
a 6 step quality management system
-
01Design examination
-
02Sampling inspection
-
03Receipt inspection
-
04Prior inspection
-
05Inspection
-
06Completion inspection
-
Material quality management before constructionPrior review and action on consistency and error in design books
-
Before material carry-in to sitePrior action on nonconforming subsidiary materials in the sampling inspection phase
-
Site measurement / check under supervisionSupervision point/hold point determination. Quantity measurement
-
Quality check on package finishingCompletion inspection on packaging before completion of construction by type of construction
General Safe Environment Management
Safety
Reinforcement T/F
Occupational Safety/
Health Committee